I am student at Durban university of technology doing electrical heavy current s4,i am designing a substation capable of consuming 100MVA with375KVA ,60Hz in input and 132KV and 50hz using same power.so my problem is how to change the 60hz to 50hz,including wiring diagram
I am student at Durban university of technology doing electrical heavy current s4,i am designing a substation capable of consuming 100MVA with375KVA ,60Hz in input and 132KV and 50hz using same power.so my problem is how to change the 60hz to 50hz,including wiring diagram
29/09/2011 @ 19:35
Capacitor values are unclear. Are these stated in farrads??? Or micro/nano?
A response would be appreciated
Thanks in advance
27/01/2014 @ 19:21